{"id":273,"date":"2016-04-06T02:12:47","date_gmt":"2016-04-06T02:12:47","guid":{"rendered":"https:\/\/civil.utm.my\/ethesis\/?page_id=273"},"modified":"2016-05-03T07:48:14","modified_gmt":"2016-05-03T07:48:14","slug":"2010-2","status":"publish","type":"page","link":"https:\/\/civil.utm.my\/ethesis\/masters\/structure-and-materials\/2010-2\/","title":{"rendered":"2010"},"content":{"rendered":"<p style=\"text-align: left;\"><span style=\"color: #999999;\"><em><span style=\"font-size: 8pt;\">Updated : 03\/05\/2016<\/span><\/em><\/span><\/p>\n<ol>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/A-Green-Cost-Allocation-Model-For-Office-And-Commercial-Buildings-In-Malaysia-Behzad-Hamidi.pdf\">A Green Cost Allocation Model For Office And Commercial Buildings In Malaysia &#8211; Behzad Hamidi<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Adequacy-Of-Contract-Provision-In-Managing-Construction-Failure-\u2013-Naadira-Binti-Che-Kamaruddin.pdf\">Adequacy Of Contract Provision In Managing Construction Failure &#8211; Naadira Binti Che Kamaruddin<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Allowable-Interface-Slip-Of-Composite-Slab-To-Achieve-Full-Interaction-Behaviour-\u2013-Rohizat-Ariffin.pdf\">Allowable Interface Slip Of Composite Slab To Achieve Full Interaction Behaviour &#8211; Rohizat Ariffin<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Analysis-Of-Cold-Formed-Steel-Connections-Muhamad-Khairi-Abd-Khalil.pdf\">Analysis Of Cold-Formed Steel Connections &#8211; Muhamad Khairi Abd Khalil<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Application-Of-2-Dimensional-Digital-Image-Correlation-For-Mapping-Bond-Strain-And-Stress-Distribution-In-Concrete-\u2013-Reza-Aghlara-1.pdf\">Application Of 2-Dimensional Digital Image Correlation For Mapping Bond Strain And Stress Distribution In Concrete &#8211; Reza Aghlara<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Application-Of-Bim-In-Sustainability-Analysis-\u2013-Hamed-Golzarpoor.pdf\">Application Of Bim In Sustainability Analysis &#8211; Hamed Golzarpoor<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Assessment-Of-The-Potential-Benefits-Of-Four-Dimensional-Planning-And-Scheduling-Software-In-Construction-Project-\u2013-Mohd-Syah-Rizal-Bin-Yahya.pdf\">Assessment Of The Potential Benefits Of Four-Dimensional Planning And Scheduling Software In Construction Project &#8211; Mohd Syah Rizal Bin Yahya<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Beam-To-Column-Connection-Using-Hollow-Steel-Section-For-Precast-Concrete-Frames-\u2013-Mohamad-Zaki-Bin-Majid.pdf\">Beam-To-Column Connection Using Hollow Steel Section For Precast Concrete Frames &#8211; Mohamad Zaki Bin Majid<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Behavior-Of-Lightweight-Concrete-Containing-Palm-Oil-Shell-As-Coarse-Aggregate-Bitrus-Emmanuel-Achara.pdf\">Behavior Of Lightweight Concrete Containing Palm Oil Shell As Coarse Aggregate Bitrus &#8211; Emmanuel Achara<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Behaviour-Of-Wide-Reinforced-Concrete-Beam-In-Shear-\u2013-Haidar.R.Hashim-Al.Dywany.pdf\">Behaviour Of Wide Reinforced Concrete Beam In Shear &#8211; Haidar.R.Hashim Al.Dywany<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Building-Performance-With-Different-Bedrock-Response-Spectrum-\u2013-Nik-Zainab-Binti-Nik-Azizan.pdf\">Building Performance With Different Bedrock Response Spectrum &#8211; Nik Zainab Binti Nik Azizan<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Building-Performance-Diagnoses-Using-Post-Occupancy-Evaluation-For-Low-Energy-Office-Building-Practices-Hamed-Ganjbakhsh-1.pdf\">Building Performance Diagnoses Using Post Occupancy Evaluation For Low Energy Office Building Practices &#8211; Hamed Ganjbakhsh<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Cadangan-Perjanjian-Aras-Perkhidmatan-Sla-Untuk-Aktiviti-Di-Antara-Sektor-Bisnes-Dan-Sektor-Pakar-Di-Jkr-\u2013-Mohd-Azmi-Bin-Asif.pdf\">Cadangan Perjanjian Aras Perkhidmatan (Sla) Untuk Aktiviti Di Antara Sektor Bisnes Dan Sektor Pakar Di Jkr &#8211; Mohd Azmi Bin Asif<\/a><\/li>\n<li style=\"text-align: left;\">Challenges In Coordination Process For Tall Building Construction &#8211; Mohd Nasir Bin Mohd Noor<\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Critical-Success-Factors-For-Contracting-Organization-During-Recession-Azlinda-Binti-Mat-Lazim.pdf\">Critical Success Factors For Contracting Organization During Recession &#8211; Azlinda Binti Mat Lazim<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Collaboration-And-Communication-Of-Project-Team-In-Pwd-Web-Based-Project-Monitoring-System-\u2013-Redzuan-Bin-Jaafar.pdf\">Collaboration And Communication Of Project Team In Pwd Web Based Project Monitoring System &#8211; Redzuan Bin Jaafar<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Column-Design-With-Semi-Rigid-End-Frame-\u2013-Wan-Hidayatul-Hak-Binti-Wan-Jusoh.pdf\">Column Design With Semi-Rigid End Frame &#8211; Wan Hidayatul Hak Binti Wan Jusoh<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Contractors-Time-Performance-In-Affordable-Housing-Program-Nazirah-Ismail.pdf\">Contractor&#8217;s Time Performance In Affordable Housing Program &#8211; Nazirah Ismail<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Construction-Safety-In-Jakarta-Indonesia-\u2013-Lanang-Ardi-Paringga.pdf\">Construction Safety In Jakarta, Indonesia &#8211; Lanang Ardi Paringga<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Construction-Duration-For-Various-Healthcare-Facility-Projects-For-Public-Works-Department-Siti-Nurulhuda-Amirrudin.pdf\">Construction Duration For Various Healthcare Facility Projects For Public Works Department &#8211; Siti Nurulhuda Amirrudin<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Cost-Effectiveness-Comparison-Of-Pre-Fabrication-With-Conventional-Construction-Method-For-RMAF-Ground-Defense-Bunker-Tan-Swee-Kok.pdf\">Cost Effectiveness Comparison Of Pre-Fabrication With Conventional Construction Method For RMAF Ground Defense Bunker &#8211; Tan Swee Kok<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Dispute-Resolution-In-Relation-To-Delay-Of-Construction-Project-Tan-Kian-Soon.pdf\">Dispute Resolution In Relation To Delay Of Construction Project &#8211; Tan Kian Soon<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Development-Of-Quantitative-Quality-Cost-Matrix-For-Malaysian-Construction-Quality-Management-System-Mukhtar-Che-Ali.pdf\">Development Of Quantitative Quality Cost Matrix For Malaysian Construction Quality Management System &#8211; Mukhtar Che Ali<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Efficiency-In-Construction-Process-Tahrina-Taib.pdf\">Efficiency In Construction Process &#8211; Tahrina Taib<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Effective-Project-Delivery-\u2013-Strategies-For-Successful-Implementation-Of-Projects-Under-10th-Malaysia-Plan-\u2013-Hairol-Ab.-Rahim.pdf\">Effective Project Delivery \u2013 Strategies For Successful Implementation Of Projects Under 10th Malaysia Plan &#8211; Hairol Ab. Rahim<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Establishing-A-Project-Management-Office-For-A-More-Effective-And-Efficient-Implementation-Of-Projects-In-Jkr-\u2013-Hizamul-Din-Bin-Ab.-Rahman.pdf\">Establishing A Project Management Office For A More Effective And Efficient Implementation Of Projects In Jkr &#8211; Hizamul-Din Bin Ab. Rahman<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Factors-Associated-With-Communication-Performance-In-Jkr-\u2013-Fazilah-Binti-Musa.pdf\">Factors Associated With Communication Performance In Jkr &#8211; Fazilah Binti Musa<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Factors-Influence-Construction-Time-Performance-For-Ibs-In-Malaysia-Construction-Industry-\u2013-Siti-Nur-Hafizeanie-Binti-Salahuddin.pdf\">Factors Influence Construction Time Performance For Ibs In Malaysia Construction Industry &#8211; Siti Nur Hafizeanie Binti Salahuddin<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Factors-Influencing-To-The-Selection-Of-Sewage-Treatment-Plant-Noor-Wahyu-Ngadimin.pdf\">Factors Influencing To The Selection Of Sewage Treatment Plant &#8211; Noor Wahyu Ngadimin<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Faktor-Faktor-Kritikal-Yang-Mempengaruhi-Tempoh-Penyiapan-Projek-Projek-Jabatan-Kerja-Raya-\u2013-Samri-Bin-Embong.pdf\">Faktor-Faktor Kritikal Yang Mempengaruhi Tempoh Penyiapan Projek-Projek Jabatan Kerja Raya &#8211; Samri Bin Embong<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Finite-Element-Analysis-Of-Reinforced-Concrete-Column-With-Longitudinal-Hole-\u2013-Amirhossein-Basravi.pdf\">Finite Element Analysis Of Reinforced Concrete Column With Longitudinal Hole &#8211; Amirhossein Basravi<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Flexural-Behavior-Of-Precast-Concrete-Slab-With-Steel-Fibre-Concrete-Topping-\u2013-Farnoud-Rahimi-Mansour.pdf\">Flexural Behavior Of Precast Concrete Slab With Steel Fibre Concrete Topping &#8211; Farnoud Rahimi Mansour<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Flexural-Behavior-Of-Wire-Reinfofced-Concrete-Beam-Hayder-Fakharazi.pdf\">Flexural Behavior Of Wire-Reinfofced Concrete Beam &#8211; Hayder Fakharazi<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Hot-Climate-Air-Flow-Study-And-Affect-Of-Stack-Ventilation-In-Residential-Building-\u2013-Ali-Tighnavard-Balasbaneh.pdf\">Hot Climate Air Flow Study And Affect Of Stack Ventilation In Residential Building &#8211; Ali Tighnavard Balasbaneh<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Improvement-Of-Project-Planning-Process-To-Satisfy-Clients\u2019-Satisfaction-In-Project-Implementation-\u2013-Wan-Norhayati-Bt-Wan-Abdul-Ghani.pdf\">Improvement Of Project Planning Process To Satisfy Clients\u2019 Satisfaction In Project Implementation &#8211; Wan Norhayati Bt Wan Abdul Ghani<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Improvement-Of-Structural-Stability-For-Multi-\u2013Storey-Building-By-Using-Composite-Column-And-Cable-Connection-\u2013-Yashar-Arvin.pdf\">Improvement Of Structural Stability For Multi \u2013Storey Building By Using Composite Column And Cable Connection &#8211; Yashar Arvin<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Improving-Safety-Control-Of-Pwd-Project-Through-The-Inclusion-Of-Safety-Requirement-In-The-Bill-Of-Quantity-\u2013-Norman-Bin-Md.-Rabani.pdf\">Improving Safety Control Of Pwd Project Through The Inclusion Of Safety Requirement In The Bill Of Quantity &#8211; Norman Bin Md. Rabani<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Improving-The-Process-Of-Capturing-Clients\u2019-Needs-\u2013-Faizah-Binti-Ibrahim.pdf\">Improving The Process Of Capturing Clients\u2019 Needs &#8211; Faizah Binti Ibrahim<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Improving-Time-Estimation-In-Jkr-Project-\u2013-Muhamad-Khair-Bin-Hasan.pdf\">Improving Time Estimation In Jkr Project &#8211; Muhamad Khair Bin Hasan<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Kelewatan-Proses-Pengambilan-Tanah-\u2013-Kesan-Terhadap-Kontraktor-\u2013-Mohammad-Faazil-Bin-Fakharazi.pdf\">Kelewatan Proses Pengambilan Tanah \u2013 Kesan Terhadap Kontraktor &#8211; Mohammad Faazil Bin Fakharazi<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Nonlinear-Finite-Element-Analysis-Of-Steel-Concrete-Composite-Slabs-Using-Explicit-Dynamics-Procedure-\u2013-Mohammad-Joshani.pdf\">Nonlinear Finite Element Analysis Of Steel-Concrete Composite Slabs Using Explicit Dynamics Procedure &#8211; Mohammad Joshani<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Mobile-Application-Prototype-For-On-Site-Information-Management-In-Construction-Industry-Mehdi-Nourbakhsh.pdf\">Mobile Application Prototype For On-Site Information Management In Construction Industry &#8211; Mehdi Nourbakhsh<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Penjadualan-Projek-Untuk-Pembinaan-Jalan-Di-Kawasan-Tanah-Berpaya-\u2013-Ahmad-Azizi-Bin-Ismail.pdf\">Penjadualan Projek Untuk Pembinaan Jalan Di Kawasan Tanah Berpaya &#8211; Ahmad Azizi Bin Ismail<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Productivity-Rate-Of-Roof-Works-For-Jkr-School-Project-Scheduling-\u2013-Zuraida-Zaini-Rijal.pdf\">Productivity Rate Of Roof Works For Jkr School Project Scheduling &#8211; Zuraida Zaini Rijal<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Project-Management-Maturity-And-Performance-Measures-Of-Project-Management-Knowledge-Areas-In-Jabatan-Kerja-Raya-\u2013-Nor-Hazlin-Binti-Mohammad.pdf\">Project Management Maturity And Performance Measures Of Project Management Knowledge Areas In Jabatan Kerja Raya &#8211; Nor Hazlin Binti Mohammad<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Proposal-For-Evaluation-Methodology-Of-Competency-Based-Project-Management-Traning-\u2013-Rosiah-Binti-Abu-Samah.pdf\">Proposal For Evaluation Methodology Of Competency Based Project Management Traning &#8211; Rosiah Binti Abu Samah<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Proposal-For-The-Enhancement-Of-Jkr-Matrix-Organization-\u2013-Atikah-Binti-Abdul-Hamid.pdf\">Proposal For The Enhancement Of JKR Matrix Organization &#8211; Atikah Binti Abdul Hamid<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Reappraisal-Of-JKR-Quality-Management-System-Wan-Ibrahim-Wan-Yusoff.pdf\">Reappraisal Of JKR Quality Management System &#8211; Wan Ibrahim Wan Yusoff<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Road-Maintenance-Management-System-A-Case-Study-At-Public-Work-Department-Nurul-Wahida-Mohamed.pdf\">Road Maintenance Management System : A Case Study At Public Work Department &#8211; Nurul Wahida Mohamed<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Seismic-Behavior-Of-Tall-Building-Structures-By-Friction-Damper-\u2013-Abdollah-Vaez-Shoushtari.pdf\">Seismic Behavior Of Tall Building Structures By Friction Damper &#8211; Abdollah Vaez Shoushtari<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Seismic-Behaviour-Of-Tunnels-With-Different-Soil-Types-And-Depths-\u2013-Ku-Safirah-Binti-Ku-Sulaiman.pdf\">Seismic Behaviour Of Tunnels With Different Soil Types And Depths &#8211; Ku Safirah Binti Ku Sulaiman<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Seismic-Vulnerability-Analysis-Of-Various-Types-Of-Dams-With-Finite-Element-Methods-\u2013-Ehsan-Noroozinejad-Farsangi.pdf\">Seismic Vulnerability Analysis Of Various Types Of Dams With Finite Element Methods &#8211; Ehsan Noroozinejad Farsangi<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Shear-Capacity-Of-Steel-Fibre-Reinforced-Concrete-Composite-Slab-\u2013-Mohd-Basri-Bin-Che-Bakar.pdf\">Shear Capacity Of Steel Fibre Reinforced Concrete Composite Slab &#8211; Mohd Basri Bin Che Bakar<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Slenderness-Study-Of-Composite-Slabs-Modeled-By-Explicit-Dynamic-Procedure-\u2013-Yusuf-Abdinasir-Mohamed.pdf\">Slenderness Study Of Composite Slabs Modeled By Explicit Dynamic Procedure &#8211; Yusuf Abdinasir Mohamed<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Strength-Properties-Of-High-Volume-Slag-Cement-Concrete-\u2013-Sasan-Parniani.pdf\">Strength Properties Of High Volume Slag Cement Concrete &#8211; Sasan Parniani<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Structural-Behaviour-Of-A-Single-Tendon-End-Block-\u2013-Maria-Binti-Nuid.pdf\">Structural Behaviour Of A Single Tendon End Block &#8211; Maria Binti Nuid<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Strength-Behaviour-Of-Column-Studs-In-Prefabricated-Wall-Panels-Using-Cold-Formed-Steel-Siti-Rahayu-Jaffar.pdf\">Strength Behaviour Of Column Studs In Prefabricated Wall Panels Using Cold-Formed Steel &#8211; Siti Rahayu Jaffar<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Sustainable-Development-Factors-For-Land-Development-In-Utm-Johor-Bahru-Campus-\u2013-Khalid-Ahmed-Mohamed.pdf\">Sustainable Development Factors For Land Development In UTM\u00a0Johor Bahru Campus &#8211; Khalid Ahmed Mohamed<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/Techniques-For-Valuation-Of-Variation-Works-Zulkhairi-Ismail.pdf\">Techniques For Valuation Of Variation Works &#8211; Zulkhairi Ismail<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/The-Awareness-Towards-Green-Office-Facilities-\u2013-Morteza-Ghaempanah-Tajabadi.pdf\">The Awareness Towards Green Office Facilities &#8211; Morteza Ghaempanah Tajabadi<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/The-Effects-Of-Pofa-From-Different-Sources-On-Durability-Of-High-Strength-Concrete-In-Malaysia-\u2013-Saleh-Omar-Ahmed-Bamaga.pdf\">The Effects Of Pofa From Different Sources On Durability Of High Strength Concrete In Malaysia &#8211; Saleh Omar Ahmed Bamaga<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/The-Efficiency-And-Effectiveness-Of-Building-Maintenance-For-College-Tun-Hussien-Onn-KTHO-Universiti-Teknologi-Malaysia-Wong-Chin-Liang.pdf\">The Efficiency And Effectiveness Of Building Maintenance For College Tun Hussien Onn (KTHO), Universiti Teknologi Malaysia &#8211; Wong Chin Liang<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/The-Potential-Adoption-Of-Relational-Contracting-In-Jabatan-Kerja-Raya-Malaysia-\u2013-Noraisah-Binti-Kadirin.pdf\">The Potential Adoption Of Relational Contracting In Jabatan Kerja Raya Malaysia &#8211; Noraisah Binti Kadirin<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/S10\/The-Shear-Behavior-Of-Steel-Fiber-Reinforced-Concrete-Beam-\u2013-Alshehri-Dhafer-Saad-A.pdf\">The Shear Behavior Of Steel Fiber Reinforced Concrete Beam &#8211; Alshehri, Dhafer Saad A<\/a><\/li>\n<\/ol>\n","protected":false},"excerpt":{"rendered":"<p>Updated : 03\/05\/2016 A Green Cost Allocation Model For Office And Commercial Buildings In Malaysia &#8211; Behzad Hamidi Adequacy Of Contract Provision In Managing Construction Failure &#8211; Naadira Binti Che Kamaruddin Allowable Interface Slip Of Composite Slab To Achieve Full Interaction Behaviour &#8211; Rohizat Ariffin Analysis Of Cold-Formed Steel Connections &#8211; Muhamad Khairi Abd Khalil [&hellip;]<\/p>\n","protected":false},"author":243,"featured_media":0,"parent":67,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"class_list":["post-273","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/civil.utm.my\/ethesis\/wp-json\/wp\/v2\/pages\/273","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/civil.utm.my\/ethesis\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/civil.utm.my\/ethesis\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/civil.utm.my\/ethesis\/wp-json\/wp\/v2\/users\/243"}],"replies":[{"embeddable":true,"href":"https:\/\/civil.utm.my\/ethesis\/wp-json\/wp\/v2\/comments?post=273"}],"version-history":[{"count":0,"href":"https:\/\/civil.utm.my\/ethesis\/wp-json\/wp\/v2\/pages\/273\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/civil.utm.my\/ethesis\/wp-json\/wp\/v2\/pages\/67"}],"wp:attachment":[{"href":"https:\/\/civil.utm.my\/ethesis\/wp-json\/wp\/v2\/media?parent=273"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}