{"id":1157,"date":"2016-04-25T08:14:14","date_gmt":"2016-04-25T08:14:14","guid":{"rendered":"https:\/\/civil.utm.my\/ethesis\/?page_id=1157"},"modified":"2016-05-04T04:08:12","modified_gmt":"2016-05-04T04:08:12","slug":"2009-2","status":"publish","type":"page","link":"https:\/\/civil.utm.my\/ethesis\/masters\/construction-management\/2009-2\/","title":{"rendered":"2009"},"content":{"rendered":"<p><span style=\"color: #999999; font-size: 8pt;\"><em>Updated : 25\/04\/2016<\/em><\/span><\/p>\n<ol>\n<li><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/M09\/A-Comparative-Study-Of-Construction-Project-Delays-In-Johor-And-Sabah-Region-Dayang-Sabriah-Safri.pdf\">A Comparative Study Of Construction Project Delays In Johor And Sabah Region : Dayang Sabriah Safri<\/a><\/li>\n<li><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/M09\/A-Critical-Investigation-On-The-Incorporation-Of-IBS-Knowledge-Into-The-Polytechnic-Academic-Curriculum-Erita-Mazwan-Hj-Mazlan.pdf\">A Critical Investigation On The Incorporation Of IBS Knowledge Into The Polytechnic Academic Curriculum : Erita Mazwan Hj Mazlan<\/a><\/li>\n<li>A Framework For Cost Assessment Of QMS For Building Contractors Based On Biological Immune System : Ali Kayrafar<\/li>\n<li><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/M09\/A-Web-Based-Environment-For-Buildings-Life-Cycle-Cost-Analysis-Masoud-Gheisari.pdf\">A Web Based Environment For Buildings Life Cycle Cost Analysis : Masoud Gheisari<\/a><\/li>\n<li>Achicving Sustainable Construction In Double Tracks Projects : Abu Bakar Othman<\/li>\n<li><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/M09\/Barriers-In-The-Implementation-Of-Industrialised-Building-System-In-Malaysian-Construction-Industry-Kong-Xi-Haw.pdf\">Barriers In The Implementation Of Industrialised Buildings System In Malaysian Construction Industry : Kong Xi Haw<\/a><\/li>\n<li><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/M09\/Buildability-In-Bridge-Construction-Case-Study-Of-Sungai-Johor-Cable-Stayed-Bridge-Mardiyah-Zahidi.pdf\">Buildability In Bridge Construction : Case Study Of Sungai Johor Cable Stayed Bridge : Mardiyah Zahidi<\/a><\/li>\n<li>Building Maintenance In Tripical Climate : Farambod Mohammadi<\/li>\n<li><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/M09\/Cable-Stayed-Bridge-Construction-Case-Study-Of-Sungai-Johor-Cable-Stayed-Bridge-Lee-Foo-Wei.pdf\">Cable Stayed Bridge Construction : Case Study Of Sungai Johor Cable Stayed Bridge : Lee Foo Wei<\/a><\/li>\n<li>Change Order Causes And Control In The Oil And Gas Construction Projects : Masoumeh Mosavat<\/li>\n<li><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/M09\/Connection-Systems-For-Braced-And-Unbraced-Precast-Structure-Due-To-Lateral-Loadings-Quek-Keng-Hua.pdf\">Connection Systems For Braced And Unbraced Precast Structure Due To Lateral Loadings &#8211; Quek Keng Hua<\/a><\/li>\n<li>Construction Site Noise Control : A Case Study For UTM&#8221;S Project : Fatemeh Nateghi<\/li>\n<li><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/M09\/Construction-Waste-Generated-In-Conventional-Method-Of-Construction-Ong-Eng-Guan.pdf\">Construction Waste Generated In Conventional Method Of Construction : Ong Eng Guan<\/a><\/li>\n<li>Cost Of Compliance With Safety And Health Requirements In Construction Site : Akmal Wani Sulong<\/li>\n<li>Delay In Issuance Of Certificate Of Fitness For Occupation : Colline Anak John Sitin<\/li>\n<li>Dispute Management In Construction Industry : Chai Chang Sa&#8217;ar<\/li>\n<li><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/M09\/Effectiveness-Of-Industrialised-Building-System-IBS-Implementation-For-Malaysian-Construction-Industry-Mardhiah-Zawawi.pdf\">Effectiveness Of Industrialised Building System ( IBS ) Implementation For Malaysian Construction Industry : Mardhiah Zawawi<\/a><\/li>\n<li><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/M09\/Energy-And-C02-Emission-Evaluation-Of-Concrete-Waste-Pooria-Rashvand.pdf\">Energy And C02 Emission Evaluation Of Concrete Waste : Pooria Rashvand<\/a><\/li>\n<li><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/M09\/E-Site-Organiser-For-Project-Monitoring-System-Ting-Ding-Kiat.pdf\">E-Site Organiser For Project Monitoring System : Ting Ding Kiat<\/a><\/li>\n<li><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/M09\/Factors-Affecting-In-The-Preparation-Of-Construction-Work-Schedule-Justin-Bong-Chunn-Tat.pdf\">Factors Affecting In The Preparation Of Construction Work Schedule : Justin Bong Chunn Tat<\/a><\/li>\n<li>Factors Affecting The Contractor&#8217;s Mark-Up Size Decision In Malaysia : Tey Kim Hai<\/li>\n<li><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/M09\/Formulation-Of-Key-Performance-Indicators-Through-Implementation-Of-Private-Finance-Initiatives-PFI-In-Student-Hostel-Privatisation-At-Universiti-Teknikal-Malaysia-Melaka-Mohd-Raymie-Anang-Masuri.pdf\">Formulation Of Key Performance Indicators Through Implementation Of Private Finance Initiatives (PFI) In Student Hostel Privatisation At Universiti Teknikal Malaysia Melaka &#8211; Mohd Raymie Anang Masuri<\/a><\/li>\n<li><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/M09\/Framework-For-Stormwater-Asset-Management-Masturianeh-Musu.pdf\">Framework For Stormwater Asset Management : Masturianeh Musu<\/a><\/li>\n<li>Highway Maintenance Management : Case Study At Projek Lebuhraya Utara Selatan (PLUS) : Mohd Harzazi Harun<\/li>\n<li><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/M09\/Load-Bearing-Autoclaved-Aerated-Concrete-Wall-In-Industrialised-Building-Systems-Construction-Fung-Wen-Pui.pdf\">Load Bearing Autoclaved Aerated Concrete Wall In Industrialised Building Systems Construction &#8211; Fung Wen Pui<\/a><\/li>\n<li><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/M09\/Management-Competencies-For-Preventing-And-Reducing-Stress-At-Construction-Site-Lim-Wei-Han.pdf\">Management Competencies For Preventing And Reducing Stress At Construction Site : Lim Wei Han<\/a><\/li>\n<li><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/M09\/Managing-Variation-Order-In-MARA-Project-Syarifah-Ruzanna-Syed-Baharom.pdf\">Managing Variation Order In MARA Project : SH Ruzanna SY Baharom<\/a><\/li>\n<li>Project Risk Factors : Case Study Of Ministry Education Projects : Anida Suharti@Ami Ronida Basiron<\/li>\n<li><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/M09\/Quality-And-Satisfacation-Of-House-Owners-For-Industrialised-Building-System-And-Conventional-Building-System-Hairuddin-Mohammad.pdf\">Quality And Satisfacation Of House Owners For Industrialised Building System And Conventional Building System : Hairuddin Mohammad<\/a><\/li>\n<li><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/M09\/Reduce-Reuse-Recycle-And-Recoverry-Technique-In-Sustainable-Construction-Waste-Management-Mohd-Firdaus-Mustaffa-Kamal.pdf\">Reduce, Reuse, Recycle And Recoverry Technique In Sustainable Construction Waste Management : Mohd Firdaus Mustaffa Kamal<\/a><\/li>\n<li>Safety Cost In Scaffolding Work : Nor Haslinda Abas<\/li>\n<li>Scheduling Simulation For High Rise Building Comparison On Time Impact : Asmadi Ismail<\/li>\n<li><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/M09\/Seismic-Performance-Analysis-Of-Kuala-Lumpur-Air-Traffic-Control-Tower-By-Friction-Damper-Ong-Peng-Pheng.pdf\">Seismic Performance Analysis Of Kuala Lumpur Air Traffic Control Tower By Friction Damper &#8211; Ong Peng Pheng<\/a><\/li>\n<li>Sick Building In Faculty Of Civil Engineering, UTM : Farah Nadiah Abdul Rahim<\/li>\n<li>Simulation Of Supply Chain Management For Construction Industry : Alaaa.A.Elkaseh<\/li>\n<li>Simulations Of Tasks In Bridge Constructions : Basheer Abdul Wareth Mohammed<\/li>\n<li>Status Of E- Business Implementation In The Malaysian Construction Industry : Mohsen Foroughi-Sabzevar<\/li>\n<li>Strength,Threat And Cultural Differences :A Case Study Of Malaysian Contractor In Indonesian Construction Project : Amer Faizal Aris<\/li>\n<li>Tahap Risiko Diperingkat Rekabentuk Dan Pembinaan Untuk Projek Di Jabatan Kerja Raya : Rosnita Abdul Rani<\/li>\n<li>Tender Evaluation Using &#8221; Cut Off &#8221; Method : Noorida Haswardani Nordin<\/li>\n<li>The effectiveness Of Safety And Health Assessment Syatem In Construction ( Shassic ) : Rohaida Affandi<\/li>\n<li>The Establishment Of A Selection Guidline For Construction Of Reinforced Earth Wall : Mohd Narowi Mat Tahir<\/li>\n<li><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/M09\/The-Potential-Of-Objective-Subjective-As-Project-Procurement-Approach-Wong-Teck-Ing.pdf\">The Potential Of Objective-Subjective As Project Procurement Approach : Wong Teck Ing<\/a><\/li>\n<li><a href=\"https:\/\/civil.utm.my\/ethesis\/wp-content\/blogs.dir\/2463\/files\/MASTERS\/DSM\/M09\/Vendor-Managed-Inventory-In-Condtruction-Industry-In-Malaysia-Wai-Soon-Han.pdf\">Vendor Managed Inventory In Condtruction Industry In Malaysia : Wai Soon Han<\/a><\/li>\n<li>Web-Based Application For Value Management During Judgement Phase : Nor Suraya Suaid<\/li>\n<\/ol>\n","protected":false},"excerpt":{"rendered":"<p>Updated : 25\/04\/2016 A Comparative Study Of Construction Project Delays In Johor And Sabah Region : Dayang Sabriah Safri A Critical Investigation On The Incorporation Of IBS Knowledge Into The Polytechnic Academic Curriculum : Erita Mazwan Hj Mazlan A Framework For Cost Assessment Of QMS For Building Contractors Based On Biological Immune System : Ali [&hellip;]<\/p>\n","protected":false},"author":243,"featured_media":0,"parent":69,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"class_list":["post-1157","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/civil.utm.my\/ethesis\/wp-json\/wp\/v2\/pages\/1157","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/civil.utm.my\/ethesis\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/civil.utm.my\/ethesis\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/civil.utm.my\/ethesis\/wp-json\/wp\/v2\/users\/243"}],"replies":[{"embeddable":true,"href":"https:\/\/civil.utm.my\/ethesis\/wp-json\/wp\/v2\/comments?post=1157"}],"version-history":[{"count":0,"href":"https:\/\/civil.utm.my\/ethesis\/wp-json\/wp\/v2\/pages\/1157\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/civil.utm.my\/ethesis\/wp-json\/wp\/v2\/pages\/69"}],"wp:attachment":[{"href":"https:\/\/civil.utm.my\/ethesis\/wp-json\/wp\/v2\/media?parent=1157"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}