{"id":1147,"date":"2016-04-25T07:56:54","date_gmt":"2016-04-25T07:56:54","guid":{"rendered":"https:\/\/civil.utm.my\/ethesis\/?page_id=1147"},"modified":"2016-04-25T07:56:54","modified_gmt":"2016-04-25T07:56:54","slug":"2012-2","status":"publish","type":"page","link":"https:\/\/civil.utm.my\/ethesis\/masters\/construction-management\/2012-2\/","title":{"rendered":"2012"},"content":{"rendered":"<p><span style=\"color: #999999; font-size: 8pt;\"><em>Updated : 25\/04\/2016<\/em><\/span><\/p>\n<ol>\n<li>Achieving collaborative working environment using design and build platform : Chew Choy San<\/li>\n<li>Achieving integrated project design using Building Information Modeling (BIM) : Tan Mei Ying<\/li>\n<li>Adoption to online collaboration in the Yemeni construction industry : Mohammed Abdullah Musaed Al-Fareh<\/li>\n<li>Amalan housekeeping di tapak bina : Norliza Shahabudin<\/li>\n<li>An integration of industrialised building system with building information modelling to improve construction industry productivity : Seyed Saeed Banihashemi Namini<\/li>\n<li>Application of prevention through design concept into design process : Rizwan Ali<\/li>\n<li>Automated prediction of noise from construction site using stochastic approach : Nur&#8217;ain Idris<\/li>\n<li>Barcode and its potential application in construction : Balqis Hussin<\/li>\n<li>Building time comparison between conventional and industrialized building system using schedule simulation : Mohammad Mahdi Tahmasebi<\/li>\n<li>Challenges in managing construction projects in Palaestine : Mohammad Mousa Mohammad Abuallan<\/li>\n<li>Comparing conventional to industrialised building system construction costing : a case study of school building projects : Zuraidah Abdul Aziz<\/li>\n<li>Construction foreign labour skill drain : Huda Mastura Hailuddin<\/li>\n<li>Construction knowledge for improving buildability of slope construction : Nur Hidayah Zainal<\/li>\n<li>Construction project management practice in the Sudanese construction industry : Mario Makarious Ratib<\/li>\n<li>Construction safety in Kelantan : Mohd. Azlan Mustapa<\/li>\n<li>Cost benefit of lighting retrofit on exixting building towards energy efficient building : Armin Amirazar<\/li>\n<li>Cost comparison between IBS and conventional methods of construction : Reza Lak Ghasemabadi<\/li>\n<li>Cost control system for construction site : Lim Yong Khin<\/li>\n<li>Cost of safety compliance&#8217;s at transmission line projects : Prakash Sukur<\/li>\n<li>Cost-benefit analysis of potential Phootovoltaic Technology implementation for institutional buildings in Malaysia : Seied Abolfazl Pezeshkzadeh<\/li>\n<li>Delay in housing development approval : Wong Mee Na<\/li>\n<li>Design optimization for energy consumption in residential buildings through building information modeling : Mahmoud Shakouri Hassanabadi<\/li>\n<li>Development of a system approach for support decision making of refurbishment need : Seow Chee Wai<\/li>\n<li>Electronic field data collection system for highway inspection maintenance : Nor Husna Mohd. Ghazalee<\/li>\n<li>Energy consumption and potential retrofitting of highway Rest and Service Areas (RSAs) : Farinee Ainee<\/li>\n<li>Energy efficiency of Toll Plaza : Saeed Omer Ahmed Alkhail Balubaid<\/li>\n<li>Establishment of a work programme model for contractor : Ahmad Fauzi Awang<\/li>\n<li>Evaluating the appropriateness of using BS5228 for construction noise level prediction in Malaysia : Hamidun Mohd. Noh<\/li>\n<li>Evaluation of construction time performance and waste time reduction by utilizing lean paradigm : Ali Asghar Bavafa<\/li>\n<li>Executive dashboard reports for public sector clients in construction industry : Amir Hossein Borghei<\/li>\n<li>Feasibility study on the implementation of medium rise industrialized building system (IBS) in Aleskan Alshaabi project in Khartoum : Alaadein Abdusalam Elageb Adaam<\/li>\n<li>Foreign labour employment in construction project : Muhammad Ammar Jamadi<\/li>\n<li>Global warming potential of clay brick production in Johor : Siti Nur Zulaikha Mohamad Rasid<\/li>\n<li>Highway asset management system : Nurol Huda Dahalan<\/li>\n<li>Human comfort using passive cooler radiator in bioclimatic house : Norhidayani Mahidin<\/li>\n<li>Image recognition for measurmenet of quality in industrial building system production line : Moheb Rajaei Nia<\/li>\n<li>Impact of uncertainty on assembly of industrialized building system houseing using Monte Carlo simulation (RESTRICTED) : Hamed Rahnama<\/li>\n<li>Implementing lean production principles into the Nigerian construction industry : Adeyemo David Olusegun<\/li>\n<li>Improvement of ergonomics awareness on construction sites : Erni Fairuza Kornain<\/li>\n<li>Improving project delivery performance for Department of Irrigation and Drainage Malaysia : Azli Mohd. Hashim<\/li>\n<li>Improving safety condition in Tehran construction project : Elnaz Khankhaje<\/li>\n<li>Improving site management system by integrating Japanese concept of management : Lum Wai Khuin<\/li>\n<li>Improving work motivation of first line managers in construction project : Jason Lim Say Kai<\/li>\n<li>Industrialized building system survey in Yemen : AbdulWahab AbdulAziz Ali Asaad<\/li>\n<li>Issue and challenges of class F contractors and improvement strategies to survive in Malaysia construction industry : Jeffryl Azniel Adzar<\/li>\n<li>Lead time in construction process : Nurul Arafah Ishak<\/li>\n<li>Lean construction to construction waste management : case study on high rise project development : Sivakumar Sivarajasingham<\/li>\n<li>Life cycle costing of pressurize pipeline system for project paddy irrigation in Kelantan : Mohd. Afzainizam Noordin<\/li>\n<li>Maintenance organization at Universiti Tun Hussein Onn Malaysia (UTHM) : Mohd. Norazam Yasin<\/li>\n<li>Managing subgrade preparation process using GPS machine control system : Teoh Boon Siong<\/li>\n<li>Masalah kontraktor dormain yang berdaftar di Lembaga Pembangunan Industri Pembinaan Malaysia (CIDB) : Asmah Munajah Ismail<\/li>\n<li>Measuring project success : Hairu Nazlina Ismail<\/li>\n<li>Minimizing delay in construction projects in Tehran, Iran : Mahdi Rafieizonooz<\/li>\n<li>Minimizing variation order on construction project due to design change : Hazrin Hamdan<\/li>\n<li>Optimizing the assembly process of an industrialized building house project using mathematical modeling technique (RESTRICTED) : Mohammadhossein Kashefizadeh<\/li>\n<li>Pengawalan kos projek pembinaan oleh kontraktor : Mohamad Sofiuddin Abdul Rahman<\/li>\n<li>Pengurusan penyelenggaraan bangunan di bawah seliaan Perbandanan Kemajuan Negeri Melaka : Norfadhilah Zawawi<\/li>\n<li>Performance indicators of maintenance management system for Premier Polytechnic in Malaysia : Marshitah Muhamad<\/li>\n<li>Performance measurement of Value Management (VM) for the Malaysian construction industry : Mohsen Torabi<\/li>\n<li>Requirement of value management in construction sector at Malaysian Airports Holdings Berhad (MAHB) : Mohd. Naim Hamid<\/li>\n<li>Risk management for superior project performance in Petronas : Anuar Che Ali<\/li>\n<li>Road maintenance management system using geographic information system : Wong Yng Jeng<\/li>\n<li>Scaffolding practices at construction sites : Mohd. Azlan Shah Mohd. Din<\/li>\n<li>Self assessment green building index for residential estates : Noor Hamizah Baharin<\/li>\n<li>Shortest lead time for document management in construction for shortest lead time of projects using Microsoft Office Groove : Ali Zarebidaki<\/li>\n<li>Strategies for improvement of upstream oil and gas facilities fabricator planning and scheduling : Roslaily @ Mohamad Khairi Arjo<\/li>\n<li>The challenges in implementing incentive based contract in Jabatan Kerja Raya project : Nurrul Hudha Haryati Amzah<\/li>\n<li>The construction labor shortage in Johore Bahru : Muhammad Shahrom Mazlan<\/li>\n<li>The construction of residential houses in Gombe, Nigeria : Jibrin Hassan Suleiman<\/li>\n<li>The development of automated system for evaluating design changes fee using BIM support : Ehsan Shourangiz<\/li>\n<li>The effect of atticventilation on energy optimization in an existing green building : Mahdi Moharrami Meynagh<\/li>\n<li>The elements identification of green highways in Malaysia : Sani Balarabe Abubakar<\/li>\n<li>The impact of economic recession on construction industry in Malaysia : Mostafa Hosseini<\/li>\n<li>The practices of corporate social responsibility among construction companies in Malaysia : Athira Abdullah<\/li>\n<li>Time and budget overrun in the construction of town houses in Dubai U.A.E : Abdul Wahab Shaikh<\/li>\n<li>Time measurement for improvement for construction using deming theory : Kamyar Kabirifar<\/li>\n<li>Time overrun in construction projects at Malaysian Palm Oil Board : Abd. Jalil Ibrahim<\/li>\n<li>Toward Islamisation of construction contract system in Malaysia : Siti Zuraidah Zulkifly<\/li>\n<li>Vertical greenery system in Malaysia : Teo Kien Hee<\/li>\n<\/ol>\n","protected":false},"excerpt":{"rendered":"<p>Updated : 25\/04\/2016 Achieving collaborative working environment using design and build platform : Chew Choy San Achieving integrated project design using Building Information Modeling (BIM) : Tan Mei Ying Adoption to online collaboration in the Yemeni construction industry : Mohammed Abdullah Musaed Al-Fareh Amalan housekeeping di tapak bina : Norliza Shahabudin An integration of industrialised [&hellip;]<\/p>\n","protected":false},"author":243,"featured_media":0,"parent":69,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"class_list":["post-1147","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/civil.utm.my\/ethesis\/wp-json\/wp\/v2\/pages\/1147","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/civil.utm.my\/ethesis\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/civil.utm.my\/ethesis\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/civil.utm.my\/ethesis\/wp-json\/wp\/v2\/users\/243"}],"replies":[{"embeddable":true,"href":"https:\/\/civil.utm.my\/ethesis\/wp-json\/wp\/v2\/comments?post=1147"}],"version-history":[{"count":0,"href":"https:\/\/civil.utm.my\/ethesis\/wp-json\/wp\/v2\/pages\/1147\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/civil.utm.my\/ethesis\/wp-json\/wp\/v2\/pages\/69"}],"wp:attachment":[{"href":"https:\/\/civil.utm.my\/ethesis\/wp-json\/wp\/v2\/media?parent=1147"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}