Research & Consultancies

1. Development of an Integrated Coastal Management System, IRPA RM292, 000.00, Researcher.

2. Hydraulics Model Investigation of Beris Dam Spillway, 1999-2001, JPS, BIP, Engineer.

3. Hydrological Study in Small Island – Tioman Island, Research Contract with Humic Tropical Centre, DID, 1998 – 2000, Researcher.

4. Bridge Pier Stability via a Predictive Computer Model, Ministry of Science & Techonology, and Innovation (MOSTI) Fund, 199,500.00, Researcher.

5. Sine – Slab Commercialization Project, Client Zen – Concrete Industries Sdn Bhd, undertaken by Unitechnologies Sdn Bhd. Rm 150,000.00, Researcher.

6. Eco – Bio Block (EEB) for water quality improvement, Cadangan menaikkan kualiti air Sungai Melaka, Langkawi menggunakkan Eco – Bio Block, Aidid Conslutant, Mamoru and DID, UTSB, 2001 – 2003, Vot 266, Researcher.

7. Tsunami Modelling and Impact Studies for the North – Western Coast of Peninsular Malaysia, BIP, DID, METU, 1,999,993.90, 2007 to date, Coastal Engineer.

8. Hydraulics Assessment of Suspended Sediment Dispersion from the Disposal Site to the North of Penang Island, BIP, LI Environmental Consultants Sdn Bhd, 2007 to date, Researcher.

9. Hydraulic Study of the Proposed Islands Reclamation Development Project at Palm Springs Resort, Port Dickson, BIP, Rho – 1 Consultant Sdn Bhd, 2007, Researcher.

10. An Investigation on Tsunami Wave Energy Disipation Over Vagetated Coasts, FRGS, Mei 2007 – Mei 2009, Team Member.

11. Review of Environmental issues for EIA Study of Tanjung Pelepas Port, Tanjung Pelepas Johor, 2008, Researcher.

12. Master Plan Study for Wilayah Pembangunan Iskandar (WPI) Flood Mitigation Project. Researcher, Perunding Teknik Padu Sdn. Bhd, JPS, 2008.

13. Coastal Hydraulic and Sedimentation Study for the Assessment of Dredging Requirements for Ports and River Mouths in Malaysia: Labuan and Sabah Sites, Jabatan Laut, BIP, 2008, Researcher.

14. Enginering and Hydraulic Evaluation of Wellguard Bouy Regulated Tidal Control Gate, Wellguard, Contract Research BIP-Pending makmur Sdn Bhd, Timbalan Ketua Projek, 2009.

15. Renewing Quarry Lease at PTD 1611 and 1612 Sungai Pachat, Mukim Tanjung Surat Kota Tinggi Johor, BIP-Kamin Granite Sdn Bhd, Team Member, 2009.

16. Proposed Tin Mining at the Coast water Off Kuala Sungai Baru, Alor Gajah Melaka, Unit Perancang Ekonomi Negeri Malaka (UPEN), 2010-2011, Team Member

17. Determination of Flow Characteristics in the Vegetated Straight Compound Channel, FRGS, November 2008 – November 2010, Project Leader.

18. Flood Water Level Influenced by Trees and Vegetation along the Edge of Floodplain in Case of River Flooding, MTSF Science & Technology Research Grant, December 2008 – December 2010, Project Leader.

19. Development New Impervious Concrete Material for Floating House in Floodplain Area, FRGS, April 2010 – January 2012, Team Member.

20. Process Based Stability Formulae for Coastal Structures Made of RC-Box Sand Containers, April 2011 – March 2012, Team Member

21. The Effects of Wave Action on the Strength of Muddy Soil in Coastal Erosion, Universiti Teknologi Malaysia, 1997 – 1998, Final Year Project.

22. Scour Investigation around Multiple Bridge Piers, Universiti Teknologi Malaysia, SLAB, 1999 – 2001, Masters Thesis.

23. A Study of Overbank Flow in Non – Vegetated and Vegetated Floodplains in Compound Meandering Channels, United Kingdom, 2003 – 2006, SLAB, PhD Thesis.