Completed Projects

Research Title  Research Details
1. Interlocking blockwork system for cost-effective low and medium rise building (1/1/96 – 31/12/98)Vot No: 72076

Research Fund: IRPA, RM 76,950

Appointed as Project Member

2. Development and Performance Evaluation of Standard T-Section Bridge Beam for Malaysia (1/3/96 – 31/9/00)Vot No: 72078

Research Fund: IRPA, RM 406,600

Appointed as Project Member

3. Remaining Fatigue Life of Steel Bridges (1/8/97 – 31/8/98)Vot No: 71196

Research Fund: RMC, RM 18,150

Appointed as Project Member

4. R&D Requirements of Malaysia Construction Industry (1/1/98 –31/12/98)Vot No: 71231

Research Fund: RMC, RM 18,225

Appointed as Project Member

5. Bake Free Bricks (1/6/98 –31/5/99)Vot No: 71328

Research Fund: RMC, RM 15,000

Appointed as Project Leader

6. Developing Design Standard Library For Integrating Design and Construction (15/6/99 – 14/6/2000)Vot No: 71494

Research Fund: RMC, RM 20,000

Appointed as Project Member

7. Development of an Integrated System for Assessment of Construction Method (1/11/99 –31/10/2000)Vot No: 71502

Research Fund: RMC, RM 20,000

Appointed as Project Leader

8. The Development of an Intelligent Information Model for Construction Method Assessment in an Integrated Environment (1/1/2000 – 31/12/2001)Vot No: 72268

Research Fund: IRPA, RM 88,000

Appointed as Project Member

9. Forecasting Low-Cost Housing Demand In Malaysia Using Artificial Neural Network (1/1/2000 – 31/12/2002)Vot No: 71640

Research Fund: IRPA, RM 176,000

Appointed as Project Member

10. Teleconstruction for Construction Industry (1/1/2003 – 31/12/2005)Vot No: 74107

Research Fund: IRPA, RM 227,900

Appointed as Project Member

11. Fast Track Wall System (1/7/2006 – 1/6/2007)

Research Fund: Special Budget Allocation by UTM, RM 113, 530.00

Appointed as Project Member

12. A Computerised Work Activity Extraction from Digital Drawings (1/1/2007 – 31/12/2009)Vot No: 73320

Research Fund: CIDB, RM 1,100,000

Appointed as Project Member

13. Quatitative Safety Assessment Model In IBS Construction (1/1/2007 – 31/12/2008)Vot No: 71315

Research Fund: CIDB, RM 280,000

Appointed as Project Member

14. Quantitative Buildability Assessment for Building Design (1/12/2009 – 31/12/2011)Vot No: 68745

Research Fund: AEC Sdn. Bhd.,      RM 150,000

Appointed as Project Leader

15. Rehabilitation Attributes of Road Infrastructure Subjected to Seismic Risk (1/4/2011 – 31/3/2012)Vot No:

Research Fund: Research University Grant, RM 40,000

Appointed as Project Leader

16. Cost Optimization Modeling On Seismic Hazard Rectification for Sustainable Asset Maintenance Of School Building (1/12/2012 – 31/12/2013)Ref No: PY/2012/00888

Research Fund: Research University Grant, RM35,000

Appointed as Project Member

17. Establishing Appropriate Indoor Environment Parameter for Isolation Tb Ward Layout Design (1/4/2011 – 31/7/2013)Ref No: PY/2011/00781

Research Fund: Research University Grant, RM40,000

Appointed as Project Member

18. Model for Energy Efficiency, Environmental Quality and Material Used In Road Infrastructures (1/8/2011 – 31/7/2014)Ref No: PY/2011/01932

Research Fund: Research University Grant Flagship, RM450,000

Appointed as Project Member

19. Malaysia Green Highway Rating System (23/2/2012 – 23/11/2013)Vot No: 4B055

Research Fund: Lembaga Lebuh raya Malaysia, RM 60,000

Appointed as Project Leader

 20. Development of Bio-material for Strengthening Reinforced Concrete Structure  (8/10/2012 – 31/3/2015)Vot No: 4S042

Research Fund: CIDB, RM 230,000

Appointed as Project Member

21. Decision-Making Model in Integrating Life Cycle Costing and Green Highway Index  (1/4/2014 – 31/5/2015)Ref No: PY/2014/02253

Research Fund: Research University Grant, RM 30,000

Appointed as Project Member