  1. Analisis Kesan Pemendekan Jadual Kerja Terhadap Kos Projek : Putri Lynna A.Luthan
  2. Construction Of Kuala Lumpur Tower: A Case Study Of Technology Transfer : Lim Jee Yat
  3. Contractors’ Approaches To Risk Identification At The Tendering Stage : Thavarajah A/I Munisamy
  4. Determination Of Factors Of Delays In Construction Project By Using Linked Bar Chart Planning Method-A Case Study : Hew Kin Yoong
  5. Excusable Delays In Construction (A Case Study ) : Zubair Ahmed Memon
  6. Fire – Damaged Structures, Rebuilt Or Reinstate – Factors For Decision ( A Case Study : Chan Hun Beng
  7. Integrating Construction Scheduling And Knowledge-Based Systems For Generating Material Scheduling : Narimah Bte Kasim
  8. Kaedah Pengawalan Kos Projek Binaan Yang Diamalkan Oleh Kontraktor Di Sumatra Barat Indonesia : Indra
  9. Kajian Hubungan Rekabentuk, Fungsi Dan Kos Kemudahan Bangunan : Sharima Bte Saad
  10. Kajian Kes : Penilaian Terhadap Kos Tidak Wajar : Asrul Affandi Esan
  11. Model Statistik Dalam Strategi Menender : Azahar Ahmad
  12. Penentuan Anggaran Harga Berpatutan Bagi Turapan Jalan Blok Konkrit : Nor Hafizi Md Lani
  13. Penggunaan Surety Bond Didalam Industri Binaan Di Malaysia : Tantish Hj Kamarudin
  14. Pengurusan Pasca-Kontrak Di Majlis Daerah Kota Tinggi ( Masalah Dalam Tempoh Tanggungan Kecacatan ) : Esa Abu Bakar
  15. Pengurusan Pemulihan Dari Kelewatan Di Dalam Industri Pembinaan ( Kajian Kes : Jamiran Bin Rebu
  16. Penyediaan Pelan Kualiti Projek Untuk Perunding Penyelia : Norhanim Bte Zakaria
  17. Pre-Estimate Of School Building Using Knowledge-Based System : Kamaruddin Md Ali
  18. Reviewing The Project Delivery System Used In Malaysia Construction Industry : Tee Beng Hock
  19. Subordinates Preference Of Leadership Behaviour.- Task Orientated Or People Orientated : Saravanan
  20. The Incorporation Of Maintenance Requirements And Planning At The Design And Construction Stages : Zulkarnain Mohd Shah