Consultation: Installation of Early Warning System for mud flow landslides at Gunung Pulai

Alhamdulillah the Early Warning System has been installed. Currently two stations consist of rain gauge and water level to record and collect the data. Both station controlled by a control box that monitor the rainfall and water level increment. If the any of the parameter been triggered which may lead to mud flow the warning light and siren will be activated to the public.