After a few visit to site and geophysic testing on the Site on last Jun 2016. The consultation and research team members have decided to choose Vertical Tube Well as to increase the quality and quantity of Orang Asli Kg. Air Pasir Kluang water supply. Although there is existing vertical tube well, however the quantity of the water a bit short to fullfill the needs. Based on the Geophysical investigation using Resistivity testing. The team had concluded a new location of vertical tube well intake should be installed.
Monthly Archives: August 2016
Early Warning System – Gunung Pulai TV 1, RTM
Bengkel Pengurusan Jenazah
Consultation: Installation of Early Warning System for mud flow landslides at Gunung Pulai
Alhamdulillah the Early Warning System has been installed. Currently two stations consist of rain gauge and water level to record and collect the data. Both station controlled by a control box that monitor the rainfall and water level increment. If the any of the parameter been triggered which may lead to mud flow the warning light and siren will be activated to the public.